








The first hull plank is placed under the planksheer. Each plank is tapered at the ends to fit into the bow nose and transom. The rule is no less then 5 bulkheads per plank, 2 planks between the seams , no running seams. Run 1 ban of each series "A" "B" "C" eye ball for smooth stream line. Drill each plank 5/64" into each bulkhead using 5/64" dowels made from stock. This will insure tight fit against bulkheads and give a smooth finish, all planks are glued. Razor cut and sanded dowels once it has dried. Hull spaces will be filled with wood putty primed and painted black with a red bottom detailed with a white line running alone the planksheer.
No comments:
Post a Comment